Diversions in the local area due to road works
A205 Upper Richmond Road, Putney
15 March — 07 April
Delays likely Traffic control (two-way signals)
Works location: A205
Works description: F/W Reconstruction, Lamp Column Relocation, Removal Of Bullards
Responsibility for works: Transport For London
A205 Upper Richmond Road, Putney
21 March — 09 April
Delays likely Lane closure
Works location: A205
Works description: Working On Behalf Of Thames Water Carrying Out Mains Connections In Order To Provide A Better Water Main Network. Works Will Be In Cw And F/W Under Give And Take
Responsibility for works: Thames Water
Vine Road, Barnes
21 March — 24 March
Delays likely Road closure
Works location: Level Crossing
Works description: Road Resurfacing And White Lininig, 23:00 Mon 21st To 07:00 Wed 24th March 2016 Daily
Responsibility for works: Network Rail Infrastructure Ltd
A205 Upper Richmond Road, Putney
23 March — 24 March
Delays likely Traffic control (two-way signals)
Works location: A205
Works description: Maintenance:Failed Patch Uneven+Loss Of Materials 10 Sqm. Lane 1
Responsibility for works: Transport For London
Source: Roadworks.org
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
March 24, 2016
|