Road Closures Ahead in Putney and Roehampton

Diversions in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

A205 Upper Richmond Road, Putney

12 April — 13 April

Delays likely Traffic control (multi-way signals)

Works location: A205

Works description: Signal Loop Installation Works Multi Way Lights A Minimum Of One (1) Lane Will Be Maintained At All Times. Access And Egress To And From Side Roads Will Be Maintained At All Times. Maximum Green Phase Time Will Be Maintained On The Upper Richmond Road Phases."

Responsibility for works: Transport For London

Current status: Planned work about to start

A3209 Putney Bridge Road

11 April — 11 April

Delays likely Lane closure

Works location: A3209

Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

A3 Wandsworth High Street, Wandsworth

12 April — 14 April

Delays likely Lane closure

Works location: A3

Works description: New Water Connection 1x2 Port Mtrd Manifold Off 4" Ci Main Excavating 2min Footway. Our Intention Is To Complete The Permanent Reinstatement Inthe Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

Putney Bridge, Putney

12 April — 13 April

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Wandsworth London Borough Council

Current status: Planned work about to start

B349 Lower Richmond Road, Putney
07 April — 11 April
Delays likely Traffic control (priority working)
Works location: B349
Works description: Build 2 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S),Install 12m Of 1 Way Poly Duct In Footway,Install 2m Of 2 Poly Ducts In Footway,Install 6m Of 1 Way Poly Duct In Carriageway.
Responsibility for works: BT
Current status: Planned work about to start

A3 Kingston Road, Roehampton
04 April — 12 April
Delays likely Lane closure
Works location: A3
Works description: Replacement Of Existing Digital Speed Safety Camera. Works Will Involve C/W Slot Cutting And Installing Sensors, F/W Feeder Pillar Work, Replace Camera Pole And Associated F/W Works.
Responsibility for works: Transport For London



Source: Roadworks.org

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

April 11, 2016