Diversions and delays in the local area due to road works
West Hill, Wandsworth
29 September — 30 September
Delays likely Contra-flow
Works location: -
Works description: -
Responsibility for works: Transport For London
B349 Lower Richmond Road, Putney
21 July — 30 September
Delays likely Traffic control (multi-way signals)
Works location: B349
Works description: Footway And Carriageway Work - Provide Electrical Supply For New Zebra Crossing, Construct New Zebra Crossing, Resurface Carriageway And Footway Reconstruction
Responsibility for works: Wandsworth London Borough Council
Putney High Street, Putney
30 September — 06 October
Delays likely Traffic control (two-way signals)
Works location: -
Works description: -
Responsibility for works: Thames Water
Upper Richmond Road, Putney
30 September — 04 October
Delays likely Traffic control (give & take)
Works location: -
Works description: -
Responsibility for works: BT
Source: Roadworks.org
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
September 29, 2016
|