Road Closures Ahead in Putney and Roehampton

Diversions and delays in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

putney road closures

Lower Richmond Road, Putney

14 March — 17 March

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: SGN

Current status: Planned work about to start

Putney Bridge Road, Putney

15 March — 17 March

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Roehampton Lane, Roehampton

14 March — 22 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Upper Richmond Road, Putney

17 March — 18 March

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Upper Richmond Road, Putney

17 March — 18 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Upper Richmond Road, Putney

17 March — 18 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Kingston Road, Roehampton,

18 March — 19 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Putney Bridge Road,

18 March — 19 March

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Putney Hill, Putney

18 March — 19 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Vine Road, Barnes

17 March — 20 March

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Planned work about to start

 

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

March 17, 2017

Bookmark and Share