Chartfield Avenue, Putney |
08 January — 12 January |
|
|
Delays possible Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Lay new service to 62 - 2 phased works - PHASE 1 - Excavate in the nearside footway maintaining 1.2m for pedestrians, excavate in the nearside carriageway using 2 way lights, D+1 reinstatement - PHASE 2 - Excavate in the farside carriageway using 2 way lights, excavate in the nearside footway maintaining 1.2m for pedestrians, D+1 reinstatement - Works being done as half and half |
|
|
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
|
|
|
|
|
|
|
|
Embankment, Putney |
08 January — 12 January |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Excavation to expose existing gas line for inspection, could not find joint in previous trial hole, further investigation needed. |
|
|
Responsibility for works: THAMES TIDEWAY TUNNEL LTD |
|
|
|
Hazlewell Road, Putney |
10 January — 12 January |
Delays unlikely Traffic control (priority working) |
Works location: Unknown |
Works description: Serv Pipe Relay Ex Fitting Sz P Carriageway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Putney Heath Lane, Putney |
10 January — 12 January |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Remedial works to be carried out - Redo DBM& Yellow Lines |
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
Woodborough Road, Putney |
11 January — 12 January |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Medfield Street, Roehampton |
12 January — 15 January |
|
|
Delays possible Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Rectifiy reinstatement defect in Carriageway in Carriageway.Consequential damage. 2-way lights agreed |
|
|
Responsibility for works: THAMES WATER |
|
|
Keswick Road, Putney |
12 January — 16 January |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 3m of 1 way poly duct in Footway,Test 1m of existing ducts to locate blockages |
|
|
Responsibility for works: Openreach |
|
|
|
|
Oakhill Road, Putney |
12 January — 15 January |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Network Operations Faults:INSTALL / REPLACE LINK BOX: (APPROX DEPTH 450mm):Replace Link Box- footway open at all times, no c/way incursion. |
|
|
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
|
|
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
January 12, 2018
|