Road Closures Ahead in Putney and Roehampton

Diversions and delays in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

putney road closures
Putney High Street
multi-way temporary traffic signals outside number 117 for Thames Water utility works on 13/05/2018. Contact: Thames Water 0800 009 3961.

Waterman Street SW15
multi-way temporary traffic signals at the junction with Lower Richmond Road for BT Openreach utility works commencing 14/05/2018 to 15/05/2018. Contact: BT Openreach 03316 607 381.

Priory Lane SW15
two-way temporary traffic signals outside number 140 for Thames Water utility works commencing 14/05/2018 to 16/05/2018. Contact: Thames Water 0800 009 3961

Royal Wedding Street Parties
The following roads will be closed over the weekend of 19th and 20th May in celebration of the Royal Wedding:

Road Name

Event Date

Closure Location

Bective Road

20/05/2018

O/S 3 to O/S 25

Carmalt Gardens

19/05/2018

O/S 2 to O/S 34

Charlwood Road

19/05/2018

J/W Felsham Road to J/W Hotham Road

Combemartin Road

19/05/2018

JW Combemartin Road to J/W Skeena Hill

Engadine Street

19/05/2018

J/W Replingham Road to J/W Brookwood Road

Fawe Park Road

19/05/2018

J/W Brandlehow Road to J/W Skelgill Road

Granard Avenue

20/05/2018

J/W St Margarets Crescent to J/W Chartfield Avenue

Longfield Street

19/05/2018

O/S 10 to O/S 74

Malbrook Road

19/05/2018

J/W Bramcote Road to J/W Woodthorpe Road

Norroy Road

19/05/2018

J/W Putney High Street to O/S 40

Rotherwood Road

19/05/2018

O/S 5 to O/S 45

Ruvigny Gardens

19/05/2018

O/S 1 to O/S 28

Seymour Road

19/05/2018

J/W Viewfield Road to J/W Wimbledon Park Road

Southfields Road

19/05/2018

J/W Haldon Road to J/W Jephtha Road

Rocks Lane (the bridge by Barnes Station) - will be subject to temporary 2-way traffic signals from 26 February to 10 July. Essential as Bridge will become too weak to take high level of traffic over it if nothing is done. London Buses will continue on their normal routes. The work on Rocks Lane railway bridge will see the use of temporary two way traffic signals which will be controlled manually between the hours of 7am and 7pm to prevent the traffic building up.

The table below is a schedule of road restrictions and rail possessions during this period.

Date/Time Activity
26th Feb to 10th July 2-way traffic signals on Rocks Lane

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

May 11, 2018

Bookmark and Share