Diversions and delays in the local area due to road works
Street Parties:
- Langside Avenue SW15 - 17th June O/S 17 to O/S 28
- Gladwyn Road - 23rd June J/W Bendemeer Road to J/W Lower Richmond Road
Clarence Lane, Roehampton |
28 May — 15 July |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: WORKING ON BEHALF OF THAMES WATER: SURFACE LOCATION: FW/CW |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU823H553/MHA632/Z004 |
|
Clarence Lane, Roehampton |
28 May — 15 July |
Delays unlikely Some carriageway incursion |
Works description: WORKING ON BEHALF OF THAMES WATER: SURFACE LOCATION: FW/CW |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU823H553/MHA632/Z004 |
|
|
|
|
A3209 Putney Bridge Road, |
04 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: NEW GAS CONNECTION |
|
|
Responsibility for works: Wandsworth |
|
|
Current status: Planned work about to start |
|
|
Works reference: PB020S000000000478 |
|
|
|
|
|
Fawe Park Road, Putney, |
04 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: New Gas Connections |
|
|
Responsibility for works: Wandsworth |
|
|
Current status: Planned work about to start |
|
|
Works reference: PB020S000000000479 |
|
|
|
|
|
|
|
|
|
A3209 Putney Bridge Road |
04 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: NEW GAS CONNECTION |
|
|
Responsibility for works: Wandsworth |
|
|
Current status: Planned work about to start |
|
|
Works reference: PB020S000000000478 |
|
|
|
|
|
Gwendolen Avenue, Putney |
11 June — 26 June |
|
|
Delays possible Traffic control (multi-way signals) |
|
Works location: Unknown |
|
|
Works description: LAY 5M OF 180MM PE, ABANDON 5M OF 8" CI, MAKE 2 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
|
|
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
|
|
Current status: Advanced planning |
|
|
Works reference: XW053W114995725-02175 |
|
|
|
|
|
|
|
Hazlewell Road, Putney |
11 June — 11 September |
|
|
Delays unlikely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: LAY 600M OF 180MM PE, 50M OF 63MM PE, ABANDON 600M OF 8" CI, 50M OF 2" CI, TRANSFER 77 SERVICES, MAKE 21 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
|
|
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
|
|
Current status: Advanced planning |
|
|
Works reference: XW053W115001687-02281 |
|
|
|
|
Holroyd Road, Putney |
11 June — 17 July |
|
|
Delays unlikely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: LAY 215M OF 125MM PE, ABANDON 215M OF 6" CI, TRANSFER 34 SERVICES, MAKE 2 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
|
|
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
|
|
Current status: Advanced planning |
|
|
Works reference: XW053W115030140-02407 |
|
|
|
|
|
A205 Upper Richmond Road, Putney |
12 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: GAS DISCONNECTION TO 72 WEST HILL- EXCAVATE IN NEARSIDE FOOTWAY MAINTAINING 1M FOR PEDS |
|
|
Responsibility for works: SGN |
|
|
Current status: Planned work about to start |
|
|
Works reference: XW047W115296187-05667 |
|
|
|
|
Chartfield Avenue, Putney |
12 June — 15 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: OSV Locate |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031048710-001 |
|
|
Roedean Crescent, Roehampton |
12 June — 16 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: DISCONNECT 1X 2" STEEL SERVICE 1M FROM MAIN IN FOOTWAY |
|
|
Responsibility for works: Cadent |
|
|
Current status: Planned work about to start |
|
|
Works reference: AZ0071000720022 |
|
|
Balmuir Gardens, Putney |
13 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Service Pipe Repair |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031085956-001 |
|
|
|
|
Carlton Drive, Putney |
13 June — 27 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: UKPN Infrastructure Works/ New Connection |
|
|
Responsibility for works: GAS TRANSPORTATION CO LTD |
|
|
Current status: Planned work about to start |
|
|
Works reference: ZP011P-00071921/R4 |
|
|
|
Wadham Road, Putney |
13 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Service Pipe Reconnect Footway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031075611-001 |
|
|
Roehampton High Street, Roehampton |
14 June — 17 June |
|
|
Delays likely Road closure |
|
Works location: Unknown |
|
|
Works description: Resurfacing of the carriageway |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG417383746 |
|
|
|
Chartfield Avenue, Putney |
14 June — 15 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Crane Operation |
|
|
Responsibility for works: Wandsworth |
|
|
Current status: Planned work about to start |
|
|
Works reference: PB222S000000000930 |
|
|
|
|
Landford Road, Putney |
14 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500264103400 |
|
|
|
|
Malbrook Road, Putney |
15 June — 20 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU274002251YNSW--000001 |
|
|
|
|
Norroy Road, Putney |
14 June — 16 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: REMEDIAL REINSTATEMENT IN THE FOOTWAY |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU275OSV-182439-01 |
|
|
|
Fawe Park Road, Putney |
16 June — 17 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: REMEDIAL REINSTATEMENT IN FOOTWAY |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU275OSV-184197-01 |
|
|
|
|
|
Oxford Road, Putney |
16 June — 18 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Remedial works to correct defect, redo fillet |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500261782900 |
|
|
|
|
|
|
|
|
|
Roehampton High Street SW15 will be closed at the junction with Roehampton Lane for TFL resurfacing works commencing 14/06/2018 to 16/06/2018 (night works only). Contact: TFL 0343 222 1234.
Rocks Lane (the bridge by Barnes Station) - will be subject to temporary 2-way traffic signals from 26 February to 10 July. Essential as Bridge will become too weak to take high level of traffic over it if nothing is done. London Buses will continue on their normal routes. The work on Rocks Lane railway bridge will see the use of temporary two way traffic signals which will be controlled manually between the hours of 7am and 7pm to prevent the traffic building up.
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.