Diversions and delays in the local area due to road works
Street parties
Hotham Road 07/0/2018 - junction with Erpingham Road to junction with Abotstone Road.
Clarence Lane, Roehampton |
28 May — 15 July |
Delays unlikely Some carriageway incursion |
Works description: WORKING ON BEHALF OF THAMES WATER: SURFACE LOCATION: FW/CW |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU823H553/MHA632/Z004 |
Hazlewell Road, Putney |
11 June — 11 September |
Delays unlikely Traffic control (give & take) |
Works location: Unknown |
Works description: LAY 600M OF 180MM PE, 50M OF 63MM PE, ABANDON 600M OF 8" CI, 50M OF 2" CI, TRANSFER 77 SERVICES, MAKE 21 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
Current status: Advanced planning |
Works reference: XW053W115001687-02281 |
|
Holroyd Road, Putney |
11 June — 17 July |
Delays unlikely Traffic control (give & take) |
Works location: Unknown |
Works description: LAY 215M OF 125MM PE, ABANDON 215M OF 6" CI, TRANSFER 34 SERVICES, MAKE 2 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
Current status: Advanced planning |
Works reference: XW053W115030140-02407 |
|
Burston Road, Putney |
28 June — 03 July |
Delays unlikely Some carriageway incursion |
Works description: Service Pipe Repair |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031087812-001 |
|
A219 Putney Hill, Putney |
29 June — 02 July |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: Install 15m of 2 poly ducts in Carriageway,Provide 4 core drill(s) into jointbox or building |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500261201200 |
B306 Queens Ride, Barnes |
02 July — 05 July |
|
|
Delays likely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: Disconnection of supply off of 100mm main excavating 2m in footway and 1m in carriageway |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU309000805365780055-001 |
|
|
A3 West Hill, Wandsworth |
02 July — 04 July |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: CPP - Maintenance - LOOSE 1 X GRANITE KERB. Part Lane 1 |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG443388143 |
|
|
|
|
A3 West Hill, Wandsworth |
02 July — 04 July |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: CPP - Maintenance - SUNKEN 3 X SETTS + 2 SQM PAVING BLOCKS. Part Lane 1 |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG443388144 |
|
|
|
Bramcote Road, Putney |
02 July — 07 August |
|
|
Delays unlikely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: LAY 190M OF 125MM PE, ABANDON 190M OF 6" CI, COMPLETE SERVICES, MAKE 3 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
|
|
Responsibility for works: SOUTHERN GAS NETWORKS PLC |
|
|
Current status: Advanced planning |
|
|
Works reference: XW053W115029747-00591 |
|
|
Disraeli Road, Putney |
02 July — 05 July |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: WATER METER INSTALLATION IN FOOTWAY |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU039NOT-193136-01 |
|
|
Lifford Street, Putney |
02 July — 05 July |
|
|
Delays unlikely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: Service Pipe Repair |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031098970-001 |
|
|
Rusholme Road, Putney |
02 July — 04 July |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: DEFECT REPAIR IN F/W AND C/W |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU288PWIMBC02 |
|
|
B349,B306 Lower Richmond Road, Putney |
03 July — 05 July |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Remedial works in carriageway following sewer repairs |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU026002251SYQM--0007 |
|
|
|
Rocks Lane (the bridge by Barnes Station) - will be subject to temporary 2-way traffic signals from 26 February to 10 July. Essential as Bridge will become too weak to take high level of traffic over it if nothing is done. London Buses will continue on their normal routes. The work on Rocks Lane railway bridge will see the use of temporary two way traffic signals which will be controlled manually between the hours of 7am and 7pm to prevent the traffic building up.
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
July 2, 2018
|