Diversions and delays in the local area due to road works
Major Gasworks In Wandsworth One-Way System (6 weeks)
A3 West Hill, Wandsworth |
13 September — 17 September |
Delays likely Road closure |
Works location: Unknown |
Works description: Maintenance - Cyclical Works Road Closure agreed diversion over R/Bout |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG425376977 |
|
Augustus Road, Southfields |
10 September — 24 September |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: Traffic light head for works on Wimbledon Park Road& Replingham Road |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W115433562-00187 |
|
Wimbledon Park Road, Southfields |
10 September — 24 September |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: Excavate to expose 16" CI main outside 251, conduct camera survey to identify route& connections. Traffic light heads outside 247 and 254. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W115437359-06210 |
|
A3003 Lower Richmond Road, Mortlake |
17 September — 22 September |
Delays likely Traffic control (two-way signals) |
Works description: GSR SERVICE DISCONNECTION WITH EXCAVATION UNDER OURMANDATORYOBLIGATIONTO COMPLY WITH SAFETY REGULATION 1994. EXACAVATE ANDDISCONNECT DOMESTIC/COMMERCIAL 3' GAS SUPPLY. FOOTWAY ONLY |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000752607 |
|
A3003 Mortlake High Street, Mortlake |
17 September — 18 September |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: Rectifiy reinstatement defect in Footway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000030904199-002 |
|
A3205 York Road, Wandsworth |
17 September — 25 October |
Delays likely Lane closure |
Works location: Unknown |
Works description: Mobile Apparatus ... TM: f/w works, lane closure ... all days without weekends; working hours: 0800-1800 ... 24h contacts: Neil Allsopp 01 25242301 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG450392745 |
|
Penwith Road, Southfields |
17 September — 20 September |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: Serv Pipe Relay Inc Fitting Sz P Cway& Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031099387-001 |
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
September 17, 2018
|