Diversions and delays in the local area due to road works
Priory Lane, Roehampton |
01 October — 23 November |
Delays possible Traffic control (multi-way signals) |
Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000733111 |
|
|
Priory Lane, Roehampton |
01 October — 23 November |
Delays possible Traffic control (multi-way signals) |
Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000733111 |
Embankment, Putney |
05 November — 16 November |
Delays likely Road closure |
Works description: Closure to enable reconfiguration of works site as discussed at site meeting. |
Responsibility for works: THAMES TIDEWAY TUNNEL LTD |
Current status: Planned work about to start |
Works reference: ZE40500000302 |
|
A205 Upper Richmond Road, Putney |
05 November — 18 November |
Delays possible Some carriageway incursion |
Works description: WBS SC.2769.238.001.02 Replace existing pre cast concrete paving with Yorkstone paving and installation of new kerbs Fw TM Plus Width Restriction. 3.25 Running Lane. 0800 ... 1800 footway only 1.2m maintained at al times and Works will be co-ordinated internally with loading bay no carriageway incursion 10:00-15:30 only, working within same TM as YG407356687, collaborating with YG407356 87 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG407392713 |
|
A205 Upper Richmond Road, Putney |
05 November — 18 November |
Delays possible Some carriageway incursion |
Works description: WBS SC.2769.238.001.02 Replace existing pre cast concrete paving with Yorkstone paving and installation of new kerbs Fw TM Plus Width Restriction. 3.25 Running Lane. 0800 - 1800 footway only 1.2m maintained at al times and Works will be co-ordinated internally with loading bay no carriageway incursion 10:00-15:30 only, working within same TM as YG407356687, collaborating with YG407356687 |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG407392672 |
|
Princes Way, Southfields |
05 November — 16 November |
Delays possible Traffic control (two-way signals) |
Works description: New water connection 3x25mm B/P MTRD supplies off of 5" CI mainexcava ting 1m unmade, 6m carriageway& 5m in Footway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU309000803197356285-001 |
|
A205 Upper Richmond Road, Putney |
16 November — 19 November |
|
|
Delays likely Road closure |
|
Works location: Unknown |
|
|
Works description: Lay new service to No. 214 under full road closure - Excavate in the nearside footway maintaining 1m for peds, excavate in the nearside and farside carriageway under the full road closure that will be in place, D+1 reinstatement. Phase 2 provisionally booked for 23/11/18, permit XW047-W115023778-05667/2 |
|
|
Responsibility for works: SGN |
|
|
Current status: Planned work about to start |
|
|
Works reference: XW047W115023778-05667/1 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 18 November |
|
|
Delays likely Road closure |
|
Works location: Unknown |
|
|
Works description: New water connection 1x63mm B/P MTRD supply off of 6" CI main excavating2m footway and 1m in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU309000805111620040-001 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 18 November |
|
|
Delays likely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: Sluice Valve Box replace Within Carrigeway only in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031056370-001 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 18 November |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Maintenance - Repair 9 Defects - cyclic activities including Patching, Paving, Gully works, Minor Cway repairs, Lamp Columns, bollards Lane 1 closure |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG443398050 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 18 November |
|
|
Delays likely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: Boundary Box Repair within Carriageway only in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031146759-001 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 18 November |
|
|
Delays likely Traffic control (give & take) |
|
Works location: Unknown |
|
|
Works description: Valve Exchange 0 to 6" Cway in Carriageway. Our intention is to completethe Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000030854765-001 |
|
|
|
|
A3209 Putney Bridge Road |
17 November — 18 November |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: Install 4m of 1 way poly duct in Footway,Install 8m of 1 way poly duct in Carriageway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500269175701 |
|
|
|
|
A205 Upper Richmond Road, Putney |
17 November — 19 November |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Core & Vac works in collaboration with Connection works for new service to 214. Permit XW047-W115023778-05667/1 |
|
|
Responsibility for works: SGN |
|
|
Current status: Planned work about to start |
|
|
Works reference: XW027W115717324-05667/1 |
|
|
|
|
Fawe Park Road, Putney, |
17 November — 18 November |
|
|
Delays possible Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: To set up and operate stop and go |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500269175702 |
|
|
|
Embankment SW15 is closed from the junction with Lower Richmond Road to Putney Pier for Thames Tideway Tunnel utility works commencing 05/11/2018 to 16/11/2018. Contact: Kyle White 07971 675 490.
|
|
|
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
November 15, 2018
|