Diversions and delays in the local area due to road works
Augustus Road, Southfields |
08 January — 18 February |
Delays likely Road closure |
Works description: Excavate to replace approx. 200m of existing high risk 16" CI main with new 355mm PE gas main, make connections& reinstate. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W115747594-00187 |
Priory Lane, Roehampton |
14 January — 25 January |
Delays possible Traffic control (two-way signals) |
Works description: Connections Projects:Electrical service alteration to customer supply:excavation of joint holes for new service connection. |
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
Current status: Planned work about to start |
Works reference: EC40010757603 |
Enmore Road, Putney |
16 January — 18 January |
Delays likely Road closure |
Works description: CARRIAGEWAY RESURFACING - PLANE 80MM PROV & LAY 50MM BINDER COURSE & 30MM OF 10MM |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB002PN000237/JC |
|
A205 Upper Richmond Road, Putney |
14 January — 17 February |
Delays possible Some carriageway incursion |
Works description: WBS SC.2769.238.001.02 Replace existing pre cast concrete paving with York stone paving and installation of new kerb and Installation of street furniture and Paving and preparation works for installation of Santander cycle docks |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG407394908 |
|
A205 Upper Richmond Road, Putney |
14 January — 17 February |
Delays possible Some carriageway incursion |
Works description: WBS SC.2769.238.001.02 Replace existing pre cast concrete paving with York stone paving and installation of new kerb and Installation of street furniture and Paving and preparation works for installation of Santander cycle docks |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG407394908 |
|
Priory Lane, Roehampton |
14 January — 25 January |
Delays possible Traffic control (two-way signals) |
Works description: Connections Projects:Electrical service alteration to customer supply:excavation of joint holes for new service connection. |
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
Current status: Planned work about to start |
Works reference: EC40010757603 |
|
Priory Lane, Roehampton |
16 January — 18 January |
Delays possible Traffic control (two-way signals) |
Works description: Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500274103000 |
|
A219 Putney High Street, Putney |
17 January — 18 January |
Delays likely Traffic control (two-way signals) |
Works description: Rectifiy Dangerous rein defect - non-pay in Carriageway. Our intentionis to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000030969791-003 |
A3 West Hill |
17 January — 18 January |
Delays likely Lane closure |
Works description: Rectifiy reinstatement defect - non-pay in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031174144-001 |
Tideswell Road, Putney |
18 January — 19 January |
Delays likely Road closure |
Works description: CARRIAGEWAY RESURFACING - PLANE 80MM PROV & LAY 50MM BINDER COURSE & 30MM OF 10MM |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB002PN000238/JC |
Vine Road, Barnes |
19 January — 20 January |
Delays likely Road closure |
Works location: Level crossing Vine Road... |
Works description: Removal of Scrap Rail via Level crossing onto lorries... |
Responsibility for works: Network Rail |
Current status: Advanced planning |
Works reference: KL170RDG1-07-26-190119 |
|
Vine Road, Barnes |
19 January — 20 January |
Delays likely Road closure |
Works location: Vine Road Level Crossings... |
Works description: Removal of Scrap Rail via Level crossing onto lorries ... |
Responsibility for works: Network Rail |
Current status: Advanced planning |
Works reference: KL170HOU-07-26190119 |
|
|
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.