Road Closures Ahead in Putney and Roehampton

Diversions and delays in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

putney road closures

Priory Lane, Roehampton

15 February — 12 April

Delays possible Traffic control (multi-way signals)

Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000763117

B349,B306 Lower Richmond Road, Putney

24 February — 01 March

Delays likely Traffic control (two-way signals)

Works description: SEWER CLEANING - PLANNED

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002251ZXCM--000007

B349,B306 Lower Richmond Road, Putney

24 February — 01 March

Delays likely Traffic control (two-way signals)

Works description: SEWER CLEANING - PLANNED

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002251ZXCM--000004

St Johns Avenue, Putney,

25 February — 03 March

Delays likely Road closure

Works description: DSLAM STREET CABINET& POWER INSTALLATION plus PCP RESHELL. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006KNLEPSE000000PUTNEY

A306 Roehampton Lane, Roehampton

28 February — 01 March

Delays possible Some carriageway incursion

Works description: 10/308 tel0212921 - slot cut c/w sensor loops to repair traffic signals SD1 plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, southbound some c/w incursion swapping lane 1 inner then outer lane and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004502

A306 Roehampton Lane, Roehampton

02 March — 03 March

Delays likely Lane closure

Works location: Unknown

Works description: THESE WORKS ARE FOR THE INSTALLATION OF MOBILE TELECOMMUNICATIONS EQUIPMENT. THESE WORKS WILL INVOLVE THE EXCAVATION & INSTALLATION OF A NEW TELECOMS CABINET TO BE POSITIONED NEXT TO EXISTING EQUIPMENT AND INSTALLATION OF A NEW ANTENNA COLUMN ON TO PRE-INSTALLED BASES

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

Works reference: MG07237094-ICS-WK09


Galveston Road SW15 is closed outside number 32 for emergency Thames Water utility works. Estimated completion date is 28/02/2019. Contact: Thames Water 0800 009 3961.

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.