Road Closures Ahead in Putney and Roehampton

Diversions and delays in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

putney road closures
Hammersmith Bridge
is closed to vehicular traffic indefinitely due to safety concerns. For further information please contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.

A3 Kingston Road, Roehampton

15 April — 18 April

Delays likely Road closure

Works location: Unknown

Works description: Maintenance - Cyclical Works Simultaneous closure of Lanes 2 & 3 on each C/w direction to enable maintenance of all types to occur in the centre reserve & immediate surrounds. Then proposed to follow this with Lanes 1 & 2 closures, including the bus lane to facilitate the same measures in the verge, It is a natural add-on to adjoin the entire length of the A3 into one multi-night operation & have the Structure Maintenance on Tibbets Underpass executed at the same time

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG425376971

A3 Kingston Road, Roehampton

15 April — 18 April

Delays likely Road closure

Works location: Unknown

Works description: Maintenance - Cyclical Works Simultaneous closure of Lanes 2 & 3 on each C/w direction to enable maintenance of all types to occur in the centre reserve & immediate surrounds. Then proposed to follow this with Lanes 1 & 2 closures, including the bus lane to facilitate the same measures in the verge, It is a natural add-on to adjoin the entire length of the A3 into one multi-night operation & have the Structure Maintenance on Tibbets Underpass executed at the same time

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443387469

A3 Roehampton Vale, Roehampton

15 April — 18 April

Delays likely Road closure

Works location: Unknown

Works description: Maintenance - Cyclical Works Simultaneous closure of Lanes 2 & 3 on each C/w direction to enable maintenance of all types to occur in the centre reserve & immediate surrounds. Then proposed to follow this with Lanes 1 & 2 closures, including the bus lane to facilitate the same measures in the verge, It is a natural add-on to adjoin the entire length of the A3 into one multi-night operation & have the Structure Maintenance on Tibbets Underpass executed at the same time

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG425376974

A219 Putney High Street, Putney

18 April — 18 April

Delays likely Traffic control (give & take)

Works location: Unknown

Works description: Excavate in the carriageway to rectify failed reinstatement (antiskid)

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SCLDMA/NLO09706

A3 West Hill,

18 April — 20 April

Delays likely Road closure

Works location: Unknown

Works description: Maintenance - Cyclical Works Road Closure agreed diversion over R/Bout

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443387474

A3 West Hill,

18 April — 20 April

Delays likely Road closure

Works location: Unknown

Works description: Maintenance - Cyclical Works Road Closure agreed diversion over R/Bout

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG425376978

Howards Lane, Putney

17 April — 18 April

Delays likely Road closure

Works location: Unknown

Works description: Carriageway resurfacing

Responsibility for works: Wandsworth

Current status: Advanced planning

Works reference: PB002PN000362019/RH

B349,B306 Lower Richmond Road, Putney

20 April — 21 April

Delays likely Traffic control (multi-way signals)

Works location: Unknown

Works description: Remedial works to correct defect, redo cw crossing in sma to correct depth

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005WP00100500201606103

A306 Rocks Lane

08 April — 22 April

Delays likely Traffic control (multi-way signals)

Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT INSTALLATION OF NEW PRESSURE REDUCING VALVE AND STRAINER TO EXISTING METER F/W& C/W

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU821H676/PHA009/I001

B349 Mill Hill Road, Barnes

08 April — 22 April

Delays possible Some carriageway incursion

Works description: TM ONLY PERMIT TO RUN CONCURRENT WITH WORKS UNDER MU821-H676/PHA009/I001

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU821H676/PHA009/I002

A219 Putney Hill, Putney

17 April — 23 April

Delays possible Some carriageway incursion

Works location: Unknown

Works description: Water meter pit installation in carriageway

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU039MGJV/BULK/215656


Priory Lane SW15 two-way temporary traffic signals from the junction with Arabella Drive to the side of number 7 Rockingham Close for Cadent Gas utility works commencing 25/03/2019 to 20/05/2019. Contact: Cadent Gas 01455 232 822.

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.

April 18, 2019

Bookmark and Share