Diversions and delays in the local area due to road works
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A219 Putney Hill, Putney |
07 May — 14 May |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Repair Thames Water leak on 30" High pressure water main leaking underground |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU277PTML217619/01 |
|
|
|
|
A205 Upper Richmond Road, |
10 May — 11 May |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Excavate in the CW to locate Thames Water valve, make sure valve is operational, backfill and reinstate |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU277000HCV6957377/01 |
|
|
|
|
A205 Upper Richmond Road, Putney |
10 May — 11 May |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Excavate in the CW to locate Thames Water valve, make sure valve is operational, backfill and reinstate |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU277000HCV6957377/02 |
|
|
A219 Putney Hill, Putney |
11 May — 12 May |
|
|
Delays likely Contra-flow |
|
Works location: Unknown |
|
|
Works description: Locate Thames Water valve, make sure valve is operational, backfill and reinstate |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU277000HCV6961406/01 |
|
|
|
|
|
|
Augustus Road, Southfields |
01 May — 06 October |
Delays likely Road closure |
Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116070246-00187 |
|
|
Urmston Drive, Southfields |
29 April — 10 June |
Delays likely Road closure |
Works description: 1x major connection from new 250mm main onto existing 125mm PE in conjunction with gas main replacement works on Augustus Road. Closure to remain for storage& welfare as works progress up Augustus Road. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116185880-05765 |
|
|
Priory Lane SW15 two-way temporary traffic signals from the junction with Arabella Drive to the side of number 7 Rockingham Close for Cadent Gas utility works commencing 25/03/2019 to 20/05/2019. Contact: Cadent Gas 01455 232 822.
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
May 9, 2019te -->te -->te -->te -->
|