Diversions and delays in the local area due to road works
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A205 Upper Richmond Road, Putney |
22 June — 23 June |
Delays likely Lane closure |
Works description: Install 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500281881100 |
A306 Roehampton Lane, Roehampton |
22 June — 22 June |
Delays likely Lane closure |
Works description: Excavation works - Trial hole for new telecoms equipment in footway with walkway in the road for pedestrians |
Responsibility for works: O2 (UK) Limited |
Current status: Planned work about to start |
Works reference: MG01415825-RTS-CG |
|
Beaumont Road, Southfields |
20 June — 21 June |
Delays possible Traffic control (two-way signals) |
Works description: Rectifiy reinstatement defect in Carriageway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000030850759-001 |
Woodlands Way SW15 will be closed at the junction with Upper Richmond Road for carriageway resurfacing commencing 21/06/2019 to 22/06/2019.
Augustus Road, Southfields |
24 May — 21 June |
Delays likely Road closure |
Works description: Excavte and expose existing 12" CI, conduct camera survey to locate connections. Prepare existing gas mains for insertion, insert approx. 200m of new 250mm PE. Excavate & expose valves & pressure points. Undertake up to 4x major connections, transfer any services identified by camera survey, backfill & reinstate. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116194117-00187 |
|
Woodlands Way, Putney |
21 June — 22 June |
Delays likely Road closure |
Works description: Carriageway resurfacing |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB002PN000102019/RH |
Street Parties:
Enmore Road 22/06/2019 junction of Hazlewell Road to Howards Lane
Laitwood Road 22/06/2019 closed from 51 to 127
Chelverton Road 23/06/2019 junction of Charlwood Road to no 53
Augustus Road, Southfields |
01 May — 06 October |
Delays likely Road closure |
Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116070246-00187 |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
June 20, 2019
|