Diversions and delays in the local area due to road works
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A205 Upper Richmond Road, Putney |
03 July — 06 July |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Connections Projects:Electrical service alteration to customer supply:Excavation of joint holes for new service connection. |
|
|
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
|
|
Current status: Planned work about to start |
|
|
Works reference: EC40010766864 |
|
|
A306 Roehampton Lane, Roehampton |
04 July — 05 July |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of 1 way poly duct in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500270883305 |
|
|
A306 Roehampton Lane, Roehampton |
04 July — 05 July |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of 1 way poly duct in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500270883305 |
|
|
|
|
Dover House Road, Putney |
06 July — 07 July |
|
|
Delays possible Traffic control (multi-way signals) |
|
Works location: Unknown |
|
|
Works description: Install 5m of 1 way poly duct in Footway,Provide 2 core drill(s) into jointbox or building |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500279682903 |
|
|
|
|
Parkstead Road, Roehampton |
06 July — 07 July |
|
|
Delays possible Traffic control (multi-way signals) |
|
Works location: Unknown |
|
|
Works description: Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 1m of 2 poly ducts in Footway,Provide 1 core drill(s) into jointbox or building |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500279682902 |
|
|
|
|
|
|
Augustus Road, Southfields |
01 May — 06 October |
Delays likely Road closure |
Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116070246-00187 |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
July 4, 2019
|