Road Closures Ahead in Putney and Roehampton

Diversions in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

A3209 Putney Bridge Road, Wandsworth
14 January — 15 January Lane closure
Delays likely due to Streetworks
Maintenance: Failed Patch Sunken Deep +Cracking Lane 1 Them Move To Lane 2 at A3209
Responsibility: Transport For London

B349 Mill Hill Road, Barnes,
14 January — 18 January Traffic control (two-way signals)
Delays likely due to Streetworks
B Box Install
Responsibility: Thames Water

A3 Wandsworth High Street, Wandsworth
15 January — 16 January Lane closure
Delays likely due to Streetworks
10/047 Tel58992 - Access Tfl Traffic Signal Pole 19 On Central Island, Backing Boards Needs To Be Fixed. 23:00-05:00 at A3
Responsibility: Transport For London
EToN status: Planned work about to start


Source: Roadworks.org

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

January 15, 2016