Dover House Road Changes To Proceed | ||||
Work on the junction near the Upper Richmond Road starts in the Autumn
A number of changes to the road layout on Dover House Road are to be implemented later this year. The new layout aims to make the area safer for cyclists and pedestrians. The proposals are: 2) Increase the size of the kerb at the entrance of Dover House Road to slow down turning vehicles and prevent the kerb from being mounted 3) Introduce green surfacing on the section of the cycle lane that crosses the junction to make it more visible to road users and alert them of potential cyclist/motorist conflict 4) Remove the loading bay located outside 393 Upper Richmond Road, this is currently in the cycle lane and when in use cyclists are forced to cycle around the bay and into the carriageway. The loading bay outside 353 Upper Richmond Road will remain 5) Widen the carriageway slightly on Dover House Road to help buses turn more easily into the road 6) Relocate zig zag road markings on A205 Upper Richmond Road opposite the entrance to Dover House Road to allow continuation of the cycle lane The changes proposed were: 1) The introduction of 15 echelon parking bays of which two will be disabled bays 2) The widening of the existing disabled parking bays click on image for larger PDF version 3 ) Installation of two new cycle parking stands
The proposed parking restrictions would standardise parking on the service road which is currently only enforced on the north side. The restrictions proposed are Monday-Saturday parking permitted between the hours of 7am-7pm for a maximum of one hour (with no return within two hours) |